Selected work

One boulder.
700,000 tons.

That is the range we work across, and both ends of it are routine. We cut lots into mountainsides through the Ogden and Cache valleys, and we supply industrial operations by the hundred thousand tons. A single specimen stone set by hand, or a production rate held for months without a gap — same company, same pits, same standard.

Evaporation ponds laid out across the Great Salt Lake with the Wasatch range beyond
01

Compass Minerals

Evaporation ponds · Great Salt Lake, Utah

Over 700,000 tons of aggregate supplied for evaporation pond construction, delivered across nine months. At that volume the job stops being about material and becomes a logistics problem — holding a production rate for the better part of a year without a gap, keeping gradation consistent across every load, and putting trucks on site to a schedule that cannot slip. Owning the reserve and running our own plant is what makes a commitment that size something we can sign for.

Scope
Bulk aggregate supply
Volume
700,000+ tons
Duration
9 months
Location
Great Salt Lake, Utah
Bulk aggregateIndustrial scaleSustained supply
Boulder retaining wall being stacked alongside an active mountainside subdivision cut
02

White Rock

Beneath the North Ogden Divide · Phases 1–4

We were the third excavation contractor brought onto this project. The first two couldn’t finish it, and the ground is the reason. Four phases sit directly below the North Ogden Divide on land that was covered by a landslide in the 1990s — and the slide had buried existing utility lines far deeper than any record showed, some of them sixty feet down. Nothing could be cut until everything had been found. Months of discovery and prep went in ahead of the first real excavation, and the work was built around what was actually in the ground rather than what the drawings claimed. Four phases delivered.

Scope
Site prep, discovery & excavation
Ground
1990s landslide
Utilities
Located to 60 ft deep
Brought on as
Third contractor
Phases
1–4
Mountainside developmentUtility discoveryComplex ground
Line of excavators, haul trucks and dozers staged along a subdivision cut at dusk
03

Lone Cedar

Hyde Park, Utah · Phases 1–3 · Ongoing

Full development of a mountainside subdivision, carried from raw ground to finished lots. On grade this steep the excavation and the retaining have to advance together — the bank is never left unsupported between phases, and the wall goes up as fast as the cut opens.

Phase three is starting now: 180,000 cubic yards of material to move, processed on site and put back into the development rather than hauled off and replaced. Four years on the same hillside and still going.

Scope
Full subdivision development
Phases
1–3, phase 3 underway
Phase 3 volume
180,000 cu yd
Location
Hyde Park, Utah
Years
2022 – ongoing
Mountainside developmentFull site developmentOn-site processing
Full mobile crushing train with jaw, cone, screen and stackers set up on site
04

Weber Basin Water District

South Weber pit · Contract crushing

Forty thousand tons crushed in the district’s own South Weber pit. We moved the full train in for it — jaw, cone, screen and stackers running together. The cone is what separates a spread like this from a simple crush: it shapes the product and tightens the gradation, so what comes off the far end actually meets spec rather than just being smaller than it was.

Scope
Contract crushing, client pit
Volume
40,000 tons
Plant
Jaw, cone, screen & stackers
Location
South Weber, Utah
Mobile crushingCone crusherCustom gradation
Dozer working a benched hillside cut on an estate site
05

Durfee Creek Estates

North Fork, Ogden Valley, Utah

Site prep and wall setting for an estate build worked into a hillside. Ground like this has to be shaped before anything can be built on it, and the walls that hold that shape are the part nobody gets to redo later — so the stone goes in as carefully as the pad gets cut.

Scope
Site prep & wall setting
Type
Private estate build
Location
North Fork, Ogden Valley
Year
2023
Estate buildSite preparationWall setting
2025–2028Multi-year supply agreement
06

Ames Construction

Crushing, haul & staging

A standing arrangement with one of the larger heavy-civil contractors in the country. We crush the material, haul it, and stage it against their draw — so it is produced, sized and waiting before they need it rather than being chased once they do. Committed through 2028.

Scope
Crush, haul & stage
Term
2025–2028
Held at
Northshore pits
Gradations
To contractor spec
Custom crushingAggregate supplyMulti-year agreement
48,000Tons of rail ballast
07

Balfour Beatty

Washakie Renewable Energy · Biodiesel processing facility

Forty-eight thousand tons of rail ballast supplied for the rail serving the Washakie Renewable Energy biodiesel processing facility. Ballast is an unforgiving product — it has to hold gradation and angularity load after load, because the track sitting on it does not tolerate variation from one stretch to the next.

Scope
Rail ballast supply
Volume
48,000 tons
Product
Ballast gradation
Source
Northshore reserve
Rail ballastAggregate supplyIndustrial

Elsewhere

Other work

Clients and projects we haven’t photographed yet — some finished, some periodic, some still ahead of us.

Powder MountainCustom crushing · 100,000 tonsUpcoming
Western ZirconiumRail ballast supplyOgden, Utah
Schneiter’s Riverside Golf CourseBunker & top dressing sandRiverdale, Utah

Start a project

Tell us
the scope.

Send the plans, the spec, or just the rough shape of it. We’ll tell you honestly whether it’s a fit and what it takes to hit the schedule.